Tile and Shower Pros for Kirkland, Washington Conversions
This page narrows the Kirkland contractor pool to the two trades a conversion usually needs: tile and shower work. 6 licensed specialists currently show up for Kirkland, Washington.
Licenses checked · Washington State Department of Labor & Industries
14.2%of residents are 65 or older
Experience behind Kirkland's conversion listings
Kirkland's earliest active license among this page's listings goes back to 2004.
Half of the specialists shown here have held that license for 4.3 years or longer.
33% have logged a decade or more under their current license number.
None of that guarantees a great conversion in Kirkland, but it's a reasonable first filter.
Licensed conversion specialists based in Kirkland, WA
Listed A to Z by business name, pooling two license types: tile specialists and shower and bath contractors.
Golden Tile Services LLC
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · GOLDETS772QF
- Since
- 2023
- Expires
- Nov 6, 2027
- ZIP
- 98033
JP Tile Construction LLC
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · JPTILTC753QO
- Since
- 2025
- Expires
- Nov 20, 2027
- ZIP
- 98034
Kaparulin Construction Company
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · KAPARCC913Q3
- Since
- 2009
- Expires
- Jan 21, 2028
- ZIP
- 98034
Precision Stone
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · PRECIS*968B6
- Since
- 2004
- Expires
- Apr 6, 2028
- ZIP
- 98034
Quality Tile Designs
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · QUALITD799MZ
- Since
- 2021
- Expires
- Jul 9, 2028
- ZIP
- 98034
Stone & Tile Corporation
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · STONETC777DF
- Since
- 2023
- Expires
- Jun 4, 2027
- ZIP
- 98033
Before you convert, ask this
- Will the new shower keep the existing drain location, or does the drain move?
- Is this a standard base, a low-threshold pan, or a full curbless build, and what does the subfloor work look like for each?
- Will there be a grab bar blocking installed inside the walls, even if a bar isn't mounted on day one?
- What valve type is going in, pressure-balance or thermostatic, and what brand?
- Who handles the waterproofing before tile or panels go up, and what product do they use?
- Is there another tub left in the house, or does this conversion remove the last one?
- How many days will the bathroom be unusable?