Cranford's Top-Rated Tub-to-Shower Conversion Pros
Cranford homeowners weighing a conversion can start with these 10 pros, pulled from Google rather than a license file this site doesn't have for the city yet. A high rating here says people liked the outcome; it says nothing about whether a business is current on its license. Ask about that separately before you let anyone near your plumbing.
Google Maps ratings checked · How we rank
26.9%of residents are 65 or older
Experience behind Cranford's conversion listings
Pair that history with the questions in our checklist before you commit to a bid in Cranford.
10 top-rated tub-to-shower pros near Cranford
We combined each business's star average with its review volume, so one business can't out-rank another on a single glowing review alone. A rating doesn't confirm a current license, so ask for one and check it with the state before you decide.
European Standard Construction LLC Bathroom and Tile
Bathroom remodeler
- Google rating
- Reviews
- 71
- Area
- Colonia 07067
Final Touch Home Improvement inc.
Construction company
- Google rating
- Reviews
- 42
- Area
- Scotch Plains 07076
Magnolia Home Remodeling Group
General contractor
- Google rating
- Reviews
- 457
- Area
- Union 07083
TimberRidge Construction LLC
Construction company
- Google rating
- Reviews
- 31
- Area
- Cranford 07016
Clark Contractors
General contractor
- Google rating
- Reviews
- 48
- Area
- Westfield 07090
Mr. Kitchen & Bath LLC
Bathroom remodeler
- Google rating
- Reviews
- 112
- Area
- Cranford 07016
Szeles Construction LLC
General contractor
- Google rating
- Reviews
- 25
- Area
- Cranford 07016
Ballan Improvement Group
General contractor
- Google rating
- Reviews
- 23
- Area
- Cranford 07016
All County One Day Bath
Bathroom remodeler
- Google rating
- Reviews
- 441
- Area
- Springfield 07081
Primavera Builder
Bathroom remodeler
- Google rating
- Reviews
- 23
- Area
- Cranford 07016
Before you convert, ask this
- Will the new shower keep the existing drain location, or does the drain move?
- Is this a standard base, a low-threshold pan, or a full curbless build, and what does the subfloor work look like for each?
- Will there be a grab bar blocking installed inside the walls, even if a bar isn't mounted on day one?
- What valve type is going in, pressure-balance or thermostatic, and what brand?
- Who handles the waterproofing before tile or panels go up, and what product do they use?
- Is there another tub left in the house, or does this conversion remove the last one?
- How many days will the bathroom be unusable?