Tub-to-Shower Conversion Pros in Pittsburg, CA
This page narrows the Pittsburg contractor pool to the two trades a conversion usually needs: tile and shower work. 8 licensed specialists currently show up for Pittsburg, California.
Licenses checked · California Contractors State License Board
14.2%of residents are 65 or older
Experience behind Pittsburg's conversion listings
Pittsburg's conversion specialists have held their current license for a median of 12 years.
The oldest license on this page dates to 1998.
About 63% have stayed under one license number for 10 years or more.
Pair that history with the questions in our checklist before you commit to a bid in Pittsburg.
Licensed conversion specialists based in Pittsburg, CA
Listed A to Z by business name, pooling two license types: tile specialists and shower and bath contractors.
Azteca Stone Works INC
Tile contractor
- License
- C-54 Tile · 774824
- Since
- 2000
- Expires
- Feb 29, 2028
- ZIP
- 94565
Bauhaus Marble & Granite
Tile contractor
- License
- C-54 Tile · 754819
- Since
- 1998
- Expires
- Oct 31, 2026
- ZIP
- 94565
Brian Smith Tile & Stone INC
Tile contractor
- License
- C-54 Tile · 1009313
- Since
- 2015
- Expires
- Dec 31, 2027
- ZIP
- 94565
CC Tile
Tile contractor
- License
- C-54 Tile · 989802
- Since
- 2014
- Expires
- Jan 31, 2028
- ZIP
- 94565
Floor's By Contract INC
Tile contractor
- License
- C-54 Tile · 1058205
- Since
- 2019
- Expires
- Aug 31, 2027
- ZIP
- 94565
Huffman Tile & Marble
Tile contractor
- License
- C-54 Tile · 854782
- Since
- 2005
- Expires
- Feb 28, 2027
- ZIP
- 94565
RB Square Tile
Tile contractor
- License
- B General Building / C-54 Tile · 1046165
- Since
- 2018
- Expires
- Oct 31, 2028
- ZIP
- 94565
S-Tileing Renovation
Tile contractor
- License
- B General Building / C-54 Tile · 1034759
- Since
- 2018
- Expires
- Jan 31, 2028
- ZIP
- 94565
Before you convert, ask this
- Will the new shower keep the existing drain location, or does the drain move?
- Is this a standard base, a low-threshold pan, or a full curbless build, and what does the subfloor work look like for each?
- Will there be a grab bar blocking installed inside the walls, even if a bar isn't mounted on day one?
- What valve type is going in, pressure-balance or thermostatic, and what brand?
- Who handles the waterproofing before tile or panels go up, and what product do they use?
- Is there another tub left in the house, or does this conversion remove the last one?
- How many days will the bathroom be unusable?